Critical One Energy Advances MOU Plans for Critical Minerals Supply Chain, Including Ontario Antimony Processing
critical-one-energy-advances-mou-plans-for-critical-minerals-supply-chain-including-ontario-antimony-processing
November 19, 2026
Building a Canadian Antimony Supply Chain
building-a-canadian-antimony-supply-chain
November 19, 2026
Replay
Investor Webinar: 70.2% Antimony Discovery at Howells Lake
70-2-antimony-discovery-at-howells-lake
May 19, 2026
Replay
Investor Webinar: Howells Lake Drilling + EFN Agreement
howells-lake-drilling-efn-agreement
March 19, 2026
Replay

Critical One Energy Inc.

CSE:

CRTL

OTCQB:

CTLOF

FSE:

4EF

Rare, near-pure antimony at Howells Lake, Ontario. A strategic partner in Canada's antimony supply chain.
The grade
70.2% antimony over 4.0 m inside 8.0 m at 42.2%, near surface. Pure stibnite is 71.7%; no interval can read higher.
The review
Micon International's NI 43-101 report verified the 2026 drilling: the foundation for a first resource estimate.
The partners
SICC, capital and buyer. Northlink, developer of the Ontario plant we part-own. Up to C$425 million of capital, financing and offtake.
The route
Mineral freed by grinding at 92.8% to 99.1%, no arsenic or mercury minerals on the samples tested, and road, rail and plant mapped.
The Investment Case

Six reasons investors are watching Critical One now

Silver trophy cup with hammer and wrench crossed behind it, resting on a base made of four square blocks.
Rare, near-pure antimony.
Near-pure in two holes, direct-ship grade in three. Grades of 5% to 25% have shipped straight to processors; ours run to 70%.
White arrow pointing upward breaking through cracked ground symbolizing growth or breakthrough.
A larger system around it, and open.
31.5 m at 4.9% antimony along strike, 300 m of strike to 200 m of depth, open northeast, west and at depth, with gold beneath and beside.
Emblem with a gray maple leaf background featuring a hammer and pickaxe crossed in front.
Clean material, a plant we part-own.
No arsenic or mercury minerals on the samples tested, and a carried stake in the Ontario processing plant Northlink is developing.
Silver trophy cup with hammer and wrench crossed behind it, resting on a base made of four square blocks.
Capital, a buyer and a plant, first.
A strategic partner paying 48% above market, an exclusive buyer for up to 150 million pounds, and a construction financing plan, all before the first resource estimate.
White arrow pointing upward breaking through cracked ground symbolizing growth or breakthrough.
Ontario, permitted, with the First Nation at the table.
Exploration permit and Ontario grant in hand, an agreement with Eabametoong First Nation, and two ways to reach the rail.
Emblem with a gray maple leaf background featuring a hammer and pickaxe crossed in front.
Independently confirmed, funded, no debt.
Micon's check assays agree (ten of twelve, two in follow-up), the full 20,000 m program is funded, and founders, management and advisers hold 27%.
near-term milestones

What to Watch Next

Keep Me in the Loop
Catalyst
Status
Last update
Catalyst
Binding MOU with SICC and Northlink: capital, plant, buyer
Status
MOU signed
Last update
Oct 29, 2026 PR
Catalyst
Processing test work on HQ core from the East Zone
Status
Core at the lab
Last update
Nov 19, 2026 PR
Catalyst
Offtake agreement and C$400 million construction financing term sheet
Status
Term sheet pending
Last update
Oct 29, 2026 PR
Catalyst
More drilling results from 16 holes at the lab
Status
Assays pending
Last update
Nov 9, 2026 PR
Catalyst
Micon initial mineral resource estimate
Status
Targeted Q1 2027
Last update
Nov 19, 2026 PR
PROJECT ADVANTAGES

Why Howells Lake, Why Here

District control
31,074 hectares and 1,529 claims, 100% owned, with about 30 km of antimony-gold targets, most of it untested.
Two zones
Near-pure bands of massive stibnite near surface, and a wider antimony zone around them that a long-life operation would be built on.
Gold beneath and adjacent
17.0 m at 1.3 g/t gold beneath the East Zone antimony and 12.0 m at 1.3 g/t in the West Zone, 200 m to the west, open to the west.
Two ways to the rail
A ~90 km road to Pickle Lake, or the Ogoki Road north from Nakina on the CN main line, about 120 km west of the Ring of Fire corridor, where Ontario has committed C$1 billion to regional roads.
The Macro Case

Why Antimony, Why Now

Shiny metallic antimony rock crystal resting on dark rough rocks with a glowing sparkle on its tip.
Metallic shield emblem showing the map of North America with the element symbol Sb (antimony) and atomic number 51, labeled 'CRITICAL'.
Critical Mineral
On the critical mineral lists of the U.S., Canada, the EU, the UK and Japan. Munitions, night vision, semiconductors, batteries and flame retardants, with few proven substitutes.
Black and white illustration of a crystal cluster emerging from a textured outline of the North American continent.
Import Dependence
The U.S. imported 91% of the antimony it used in 2025. China supplied 55% of U.S. imports from 2021 to 2024.
Metallic icon featuring a crystal at the center surrounded by symbols of health, microchip, shield with flame, crosshair, and a star, connected by a circular line.
Governments Are Paying for Supply
US$245 million in U.S. defense contracts, a US$2.9 billion EXIM loan, C$2 billion from Canada's Critical Minerals Accelerator.
Silver metallic coin featuring trading candlestick chart, circular arrows, and checkmark symbols.
The Clock
China's ban on antimony exports to the U.S. took effect in December 2024. The one-year pause on it runs out in November.
Operator Edge

Proven Operators. Discovery Pedigree. Defense Relationships.

Middle-aged man in a dark suit and white shirt posing in front of a beige curtain.
Silver trophy cup with hammer and wrench crossed behind it, resting on a base made of four square blocks.
Built and exited companies worth over $1.5 billion
Duane Parnham
Executive Chairman & CEO
Built and sold UNX Energy ($730M exit)
Grew Forsys Metals from $45K startup to $860M valuation
$1.5B+ in total shareholder value created
Largest shareholder; fully insider-aligned
Older man with gray hair wearing large dark glasses, a light blue jacket, and a pink checked shirt.
Silver coin with a mining pickaxe crossed over a gold bar and a dollar sign.
Original Howells Lake discovery geologist
Chet Idziszek
Director
Discovered the Howells Lake deposit (original geologist)
“Mining Man of the Year” for Eskay Creek discovery
Senior role on Cobre Panama (4B tonne deposit)
Gen. (Ret.) Charles A. Flynn, Strategic Advisor
Supports U.S. defense and antimony offtake relationships
Gen. (Ret.) Charles A. Flynn
Strategic Advisor
Retired four-star U.S. Army General with 39 years of service
Former commander of U.S. Army Pacific
Senior Pentagon roles in operations, plans and training
Essential Materials

Investor Resources

Stay up to date with company materials, investor updates, and project milestones
Latest Webinar Replay
Building a Canadian Antimony Supply Chain. Recorded November 19, 2026.
Webinar title slide: The MOU is advancing. Building a Canadian antimony supply chain.
Building a Canadian Antimony Supply Chain
  • Progress under Critical One’s binding MOU with SICC
  • Financing commitments and the planned course of action
  • SICC’s engagement of Process Research ORTECH for metallurgical services
  • Evaluation of Howells Lake samples and potential antimony processing routes
  • The partners’ roles in advancing the proposed Ontario processing facility
  • Duane Parnham, Executive Chairman and CEO, Critical One Energy
  • Marc Kealey, Vice-Chairman, Solar International Core Canada (SICC)
  • Perry Kotsopoulos, Chief Development Officer, Northlink Development Group
  • Jonathan Chen, Chief Executive Officer, Process Research ORTECH
  • Matthew Trenkler, Chief Geological Officer, Critical One Energy
Watch the webinarWebinar slidesRegister
building-a-canadian-antimony-supply-chain
November 19, 2026
24:49
Replay
Hear directly from the partners on financing commitments, Howells Lake metallurgical work and the next steps under the MOU. Shareholder and investor webinar featuring Critical One Energy, Solar International Core Canada (SICC), Northlink Development Group and Process Research ORTECH, followed by audience Q&A.
critical-one-energy-advances-mou-plans-for-critical-minerals-supply-chain-including-ontario-antimony-processing
Webinar title slide for the May 19, 2026 investor webinar on the Howells Lake antimony discovery.
Investor Webinar: 70.2% Antimony Discovery at Howells Lake
  • Hole 6 massive stibnite discovery
  • 8.0 metres of 42.2% antimony, including 4.0 metres of 70.2% antimony
  • Direct shipping ore potential
  • Visible stibnite in all eight holes drilled to date
  • Pending assays and expected timing for additional results
  • Antimony supply chain strategy and North American demand
  • Howells Lake East Zone, West Zone, and West West target
  • Funding position, infrastructure, metallurgy, and refining outlook
  • Investor Q&A on next steps, catalysts, and project scale
  • Duane Parnham, Executive Chairman and CEO
  • Matthew Trenkler, PhD, P.Geo., Chief Geological Officer, Qualified Person
Watch the webinarWebinar slidesRegister
70-2-antimony-discovery-at-howells-lake
May 19, 2026
35:11
Replay
Investor webinar on the high-grade antimony discovery at the Howells Lake Antimony-Gold Project in Ontario: 8.0 metres of 42.2% antimony, including 4.0 metres of 70.2% antimony, from Hole 6. Management covers direct shipping ore potential, drilling progress, pending assays, funding and the milestones to watch next.
critical-one-energy-drills-4-0-meters-of-70-2-antimony-at-howells-lake-project
Webinar title slide for the March 19, 2026 investor webinar on Howells Lake drilling and the Eabametoong First Nation agreement.
Investor Webinar: Howells Lake Drilling + EFN Agreement
  • Howells Lake Phase I drill program
  • Eabametoong First Nation exploration agreement
  • Antimony and gold project strategy
  • 2026 exploration objectives and budget
  • Expected timing for initial drill results
  • Funding, metallurgy, and downstream outlook
  • Investor Q&A on next steps and catalysts
  • Duane Parnham, Executive Chairman and CEO
  • Matthew Trenkler, PhD, P.Geo., Chief Geological Officer, Qualified Person
Watch the webinarWebinar slidesRegister
howells-lake-drilling-efn-agreement
March 19, 2026
32:40
Replay
Investor webinar on the Howells Lake Antimony-Gold Project in Ontario, the exploration agreement with Eabametoong First Nation, and the start of Phase I drilling. Management outlines drill objectives, funding position and the milestones to watch next.
critical-one-energy-announces-live-investor-webinar-on-howells-lake-phase-i-drill-program-and-grants-stock-options

Financial filings

Explore the evidence

Visual explainers & videos

See the project, the market and the proposed supply chain in context.

View all media ↗
Graphic

Processing & strategy

MOU advances: SICC engages ORTECH

NEWS → Our MOU with SICC is advancing.

‍

Our co-development partner, Solar International Core Canada, has engaged Process Research ORTECH to provide metallurgical services to advance Ontario antimony processing.

‍

→ PRO/ORTECH will evaluate antimony recovery and processing options for producing antimony trisulphide and/or antimony trioxide.
→ 100 kg of Howells Lake HQ drill core delivered to PRO/ORTECH’s Mississauga facility for evaluation.
→ Northlink Development Group is the facility’s developer and project manager, with Critical One as future feedstock supplier and carried equity partner.
→ The test work provides the process data to design the processing plant

‍

Mining, processing and offtake, integrated under one strategic partnership.

‍
That is how a Canadian antimony supply chain gets built, with lasting value for our shareholders, Eabametoong First Nation, and North America’s industrial and defence needs.

mou-advances-sicc-engages-ortech
1080
1350
November 19, 2026
November 19, 2026
Graphic

Howells Lake

How much antimony at Howells Lake?

2 to 6 million tonnes grading 3% to 8% antimony.

That’s the new exploration target for Howells Lake.

For more than 40 years, the project was known by one number. A 1980 historical estimate from the original drilling.

Micon International, the independent firm behind our NI 43-101 technical report, has now used this year’s drilling, plus the historical results, to put a modern range on Howells Lake.

Even the low end of that range is nearly three times the old figure.

Now the drill tests it.
→ Three new holes extend the East Zone 100 metres northwest
→ 16 more holes are at the lab
→ 8 more holes planned before the end of November

Every result builds toward Howells Lake’s initial mineral resource estimate.

howells-lake-exploration-target
1080
1350
November 11, 2026
November 9, 2026
Graphic

Processing & strategy

From mine to processing: the proposed supply chain

From mine to processing, Critical One now has a role at each step.

→ The future mine: Howells Lake

→ The processing: a funded stake in a planned Ontario facility

→ The buyer: exclusive offtake for up to 150 million lb of future antimony

→ The capital: C$15M in equity, plus a construction financing plan of up to C$400M

mine-to-processing
1638
2048
October 29, 2026
October 29, 2026
Proposed antimony supply-chain graphic used as the cover for Critical One's video.
Video

Interviews & presentations

Building Canada's antimony supply chain

Critical One Energy (CSE: CRTL) is advancing high-grade antimony at Howells Lake in northern Ontario. Follow the discovery and the partnership building its path to market.

Antimony is used in defence, energy storage and advanced technologies. Critical One’s goal is to help build a Canadian supply chain serving North American demand.

Under a signed binding memorandum of understanding, Solar International Core Canada (SICC) is the principal capital and offtake partner. Northlink Development Group is developing and managing the planned Ontario antimony processing facility. Critical One participates as a future feedstock supplier and carried equity partner.

The agreement sets out:

  • C$15 million in equity investment from SICC into Critical One.
  • A C$10 million commitment funded by SICC for Critical One’s carried equity interest in the planned processing facility.
  • Up to C$400 million in conditional mine construction financing for Howells Lake.
  • Exclusive offtake rights to purchase up to 150 million pounds of future antimony production at international benchmark prices.
canadas-antimony-supply-chain-video
https://www.youtube.com/watch?v=ZjkeoJJ_DDk
16
9
October 29, 2026
October 29, 2026
40
Graphic

Howells Lake

Howells Lake: the drilled antimony footprint

How big is the East Zone so far? Big enough to measure in football fields.

That is the drilled antimony footprint at Howells Lake's East Zone, as reviewed in the Micon NI 43-101 report. One zone.

Inside it:

→ Holes 6 and 7: peaks of 70.2% and 70.3% Sb

→ Hole 16: 31.5 m at 4.9% Sb, extending the system ~70 m northeast

→ Open to the northeast and at depth

The ongoing 20,000 m program is filling in the rest of this footprint and pushing its edges out.

howells-lake-drilled-footprint
1080
1350
September 22, 2026
September 22, 2026
Graphic

Antimony market

Why U.S. antimony import reliance matters

91% import reliant.

That is how much of the antimony the U.S. consumed in 2025 came from imports. Two years earlier it was 81%.

→ China supplied 55% of U.S. antimony imports, then banned exports to the U.S. in December 2024
→ Prices more than doubled in a year, to ~$25 per pound
→ U.S. mine production only restarted in late 2025. Canada has none.

About 40% of U.S. antimony goes into ammunition and antimonial lead. Defense demand does not wait for supply chains to catch up.

That is where Howells Lake fits.

Holes 6, 7 and 16 have now traced continuous near-surface stibnite at direct-ship grades in northwestern Ontario, and the zone remains open. With 10,000 m of drilling scheduled for 2026, an initial resource estimate is targeted for Q1 2027.

North America needs an antimony source at home. Critical One is drilling to prove how much Howells Lake can supply.

us-antimony-import-reliance
1080
1350
August 27, 2026
August 27, 2025

Stock & Contacts

Investor FAQs

Common Questions About Critical One Energy

Here are the most frequent questions we receive from prospective investors.

A critical minerals exploration company with one flagship project, Howells Lake in Ontario, and one job: take its antimony from the ground to a buyer.

Listed on the CSE as CRTL, on the OTCQB as CTLOF and on the Frankfurt Stock Exchange as 4EF. Head office in Toronto.

Rare grade: pure stibnite is 71.7% antimony, and two holes at Howells Lake read 70.2% and 70.3%, near surface, with a wider antimony zone around them and gold beneath.

A partnered route to market: a strategic capital partner that is also the buyer, a developer building the Ontario plant we part-own, and a construction financing plan, all before the first resource estimate.

A tight field: few public antimony names exist, the U.S. imports almost all of the antimony it uses, and China's pause on its U.S. export ban expires on November 27, 2026.

Exploration stage. No mineral resource has been estimated, and future production is not guaranteed.

The 2026 program had drilled 34 holes and 8,342 meters by August 1, 2026; the September 29 update reported 15 of 28 numbered holes with 13 at the lab. Micon International's NI 43-101 report concluded the modern data is the foundation for continued exploration and resource modelling toward an initial mineral resource estimate for the East Zone, which drilling is building toward.

Cash of C$11.0 million at May 31, 2026, with working capital of C$10.0 million. The C$9.4 million, 20,000 m program Micon recommended is fully funded, including C$6.7 million of flow-through raised in July and August 2026. No debt.

70.3 million shares outstanding and 86.3 million fully diluted as of August 14, 2026. Founders, management and advisers hold 27.3%; institutions 22.6%; retail 50.1%.

The SICC placement adds 12.5 million shares at C$1.20, a 48% premium to market, with no warrants and a 12-month lock-up: 82.8 million basic shares, SICC at 15.1%.

Three things, before the first resource estimate: C$15 million into the treasury from an institutional partner paying 48% above market; a carried equity interest in the Ontario processing plant Northlink is developing, funded by SICC's C$10 million commitment, with a share of the plant's profits and none of its construction cost; and a buyer, SICC, with the exclusive right to purchase up to 150 million pounds of future antimony production at international benchmark prices.

Behind those, a mine construction financing plan of up to C$400 million, drawn once the studies, permits and approvals that precede a construction decision are complete.

It also changes how the project is built. The buyer's product specifications shape the processing route, and knowing the funding route this early means the project and its capital are planned together.

Howells Lake is in the homelands of Eabametoong First Nation, in Ontario's Thunder Bay Mining Division, about 120 km west of the Ring of Fire access corridor. The exploration permit and an Ontario Junior Exploration Program grant are in hand, and an exploration agreement with EFN was signed in March 2026. EFN participates in the development process as technical work advances.

Chief Solomon Atlookan, October 29, 2026: "We have begun a relationship with Duane and Critical One on respectful terms and will continue to be guided by our land users and stewards of the land."

There are two ways to reach the rail: a ~90 km road to Pickle Lake, with Green Infrastructure Partners on the planning, or the Ogoki Road north from Nakina on the CN main line. Ontario has committed C$1 billion to regional roads.

In order: assays on 13 holes as they are received; five HQ metallurgical holes and the lab and pilot test work on that material; an initial mineral resource estimate for the East Zone. November 27, 2026 is the day China's pause on its U.S. export ban expires.

Each result reaches our list the day it is public. For questions or a call with management, email ir@criticaloneenergy.com.

FROM MINE TO MARKET

DRILLING CONTINUES. ASSAYS ARE COMING.

Each result reaches our list the day it is public.
Metallic 3D speech bubble icon with a phone handset symbol inside on a gray gradient background.
CONTACT US
Gray folder icon with a bar chart and checkmark symbol representing verified data or report.
Get Updates